North Refineries Project
( 2006 ) |
|
Isomerization Unit |
|
Salahudin Refineries Enhancement |
|
Fluid Calatytic Cracking Unit ( F.C.C ) |
|
New Pressure Swing Adsorption Unit ( P.S.A) North
Refinery |
|
Hydrocrack Units Rehabilitation / second stage |
|
L.G.O Hydrotreating Unit Rehabilitation North Refinery |
|
Construction New Units For Hydrowax Production |
|
Rehabilitation Of The Second Line For Lube Oil Compelex |
|
Project Of Waste Water For Refineries ( Hadeatha –
ALKasik- Siniyah ) |
|
Project Of Storage Tanks For Refineries (Hadeatha –
ALKasik- Siniyah ) |
|
Rehabilitation And Development Of Working Package
Refineries |
|
Feeding Package Refineries with Power From The National
Grid |
|
Installing Two New Package Unit at Qaiyarah Refinery
|
|
Rehabilitation Of Asphalt Unit At Qaiyarah Refinery |
|
New Reforming & Hydrotreating Unit In Kirkuk Refinery |
|
Rehabilitation Of Unit ( 105, 107 ) in North Oil Company
/ Kirkuk |
|
Storage Tanks For Compelex |
|
Repairing The Damage Of Industrial Wast Water Treatment
Units |
|
Rehabilitation For Utilities Units ( Boiler) |
|
Developing The Electrical System |
|
Power Generating Set ( 6 x 25 )mw |
|
Modernisation of Control & Intercom System for The Unit |
|
Developing of Drums & Cans Plants |
|
Installing Pollution Laporatary |
|
Installing New Domestic Waste Water Treating Unit
|
|
Developing Industrial & General Services Units |
|
Concrete Basin ( capacity 1500 m3 ) to Gether whit
Piping Installation from Siniyah to Complex ( Length 18
km , Dia 12” )
|
|
Housing Project |